Planning and construction documents
June 2017
August 2015
- Sylvania College Center Phase II temporary wall locator map
- Metro: SW Corridor, technical updates to PCC Sylvania connection options – August 14, 2015
July 2015
May 2015
- Swan Island Center fact sheet and construction guide – May 2015
- Sylvania Campus fact sheet and construction guide – May 2015
- Southeast Campus fact sheet and construction guide – May 2015
- Cascade Campus fact sheet and construction guide – May 2015
- Metro: SW Corridor, tunnel alignments executive summary – May 2015
April 2015
- Metro: SW Corridor, HCT alignment modifications – April 15, 2015
- Metro: SW Corridor, key issues – April 13, 2015
- Portland Bureau of Planning: campus institution zoning update – April 2015
March 2015
February 2015
November 2014
September 2014
August 2014
July 2014
June 2014
May 2014
- Board report – May 2014
- Sylvania Campus fact sheet and construction guide
- Cascade Campus fact sheet and construction guide
April 2014
March 2014
January 2014
November 2013
October 2013
September 2013
June 2013
May 2013
April 2013
March 2013
June 2012
- Upcoming project list for Sylvania Campus HSW
- Schematic design presentation for Cascade Campus THA Architects
- 2008 Bond implementation draft plan for new construction 2015
- 2008 Bond implementation draft plan for new construction 2013-2014
- 2008 Bond implementation draft plan for new construction 2012-2013
- Roadshow “transparency” design features
- Roadshow “texture” design features
- Roadshow “panelization” design features
- Roadshow “landscape” design features
- Core programming diagram level 01, option B
- Rock Creek option C summary
- Rock Creek Campus program scenario 3
- Rock Creek Campus building history
- Rock Creek Bond implementation plan
- PowerPoint presentation from Cascade Campus outreach event – June 2012
- OAME site plan REVTEX
- LS 1-3 new IRF
- Local Southeast Portland vendors, contractors, and services, construction related
- Guiding document for PCC Bond Program (version 1.6)
- Framework for progressive open houses events
- Cascade SWG #13 meeting notes
- Cascade SWG #10 meeting notes
- Cascade Campus diagram of campus plan options
- Cascade BAC and SWG timeline and deliverables
- Event mailer for Cascade Campus outreach events – June 2012
April 2012
February 2012
December 2011
October 2011
September 2011
June 2011
May 2011
- PCC Southeast site plan with construction schedule – updated March 2012
- Cascade BAC meeting notes #9
- Southeast site plan schematic – May 13, 2011
April 2011
March 2011
- Cascade BAC meeting notes #6 – March 10, 2011
- Cascade BAC meeting notes #7
- Option C summary – March 14, 2011
- Option C schedule – March 14, 2011
- Option C L02 – March 14, 2011
- Option C L01 – March 14, 2011
- Option B summary – March 14, 2011
- Option B schedule – March 14, 2011
- Option B L02 – March 14, 2011
- Option B L01 – March 14, 2011
- Option A summary – March 14, 2011
- Option A schedule – March 14, 2011
- Option A L02 – March 14, 2011
- Option A L01 – March 14, 2011
February 2011
January 2011
December 2010
- PCC Rock Creek available area analysis – December 13, 2010
- Southeast Campus base plan schematic – December 12, 2010
- B5-B7 program rating results – December 2, 2010
- B5-B7 program option comments – December 2, 2010