Sylvania Health Technology (West) Renovation Project
Renovations to the west side of Sylvania’s Health Technology (HT West) building will enhance the existing spaces to create a welcoming environment that celebrates health, inclusivity, and wellness.
Improvements include upgrades to common spaces that increase accessibility and foster collaboration, the addition of three new healthcare program classrooms, and four physical education rooms.
An inclusive all-user locker room will be added, along with optimization of the building’s mechanical, electrical, and roofing systems. The renovations will improve energy efficiency and accessibility onsite, and elevate the student experience on campus.
“This renovation will advance PCC’s mission to support student success and promote a culture of diversity, equity, and inclusion.” Gary Sutton, Planning & Capital Construction Manager
Changes to expect
During construction, some building services will be impacted. Please note the following resources and temporary changes during construction:
- Temporary changing rooms and lockers are located in the first-floor lobby of HT.
- Additional lockers are located on Level 2 of HT, near both gymnasium entrances.
- A single-occupant, all-user shower is available on the second floor of HT.
- The gymnasium will be closed during summer 2025.
FAQs
Will the renovation of HT West feature one all-user locker room for everyone, or three separate locker rooms: men’s, women’s, and all-user?
Can you share examples of other all-user locker rooms to provide a better sense of how these work?
Will the fitness center be open during the renovations of HT West?
Will the gymnasium be open during construction?
Will I be able to access the weight room during renovations?
Are showers available elsewhere on campus?
Who do I contact if I have a question?
When will the project be completed?
Will parking be impacted?
Where can we change clothes for physical education classes?
Timeline
- Construction begins: November 2024
- Locker room closures: November 2024
- Grand opening: Spring 2026