Sylvania Health Technology (West) Renovation Project

3D rendering of the Sylvania HT West buildingRenovations to the west side of Sylvania’s Health Technology (HT West) building will enhance the existing spaces to create a welcoming environment that celebrates health, inclusivity, and wellness.

Improvements include upgrades to common spaces that increase accessibility and foster collaboration, the addition of three new healthcare program classrooms, and four physical education rooms.

An inclusive all-user locker room will be added, along with optimization of the building’s mechanical, electrical, and roofing systems. The renovations will improve energy efficiency and accessibility onsite, and elevate the student experience on campus.

“This renovation will advance PCC’s mission to support student success and promote a culture of diversity, equity, and inclusion.” Gary Sutton, Planning & Capital Construction Manager

Changes to expect

During construction, some building services will be impacted. Please note the following resources and temporary changes during construction:

  • Temporary changing rooms and lockers are located in the first-floor lobby of HT.
  • Additional lockers are located on Level 2 of HT, near both gymnasium entrances.
  • A single-occupant, all-user shower is available on the second floor of HT.
  • The gymnasium will be closed during summer 2025.

FAQs

Timeline

  • Construction begins: November 2024
  • Locker room closures: November 2024
  • Grand opening: Spring 2026

Project manager

CiCi Ross
Project Manager